Introduction
Please note: This guide is based upon using one 43mm spindle mount and an 43mm spindle. The required mounts, and number of them, will depend on your choice of spindle.
-
-
Rat Rig Spindle Mount - 43mm
-
2x M6x70 Cap Head Screw
-
6x 4040 Drop-in T-Nut - M8
-
2x Square Nut M6
-
6x M8x22 Cap Head Screw
-
2x M8x30 Low Profile Cap Head Screw
-
M8x12 Low Profile Cap Head Screw
-
-
-
Rat Rig Spindle Mount - 43mm
-
M8x30 Low Profile Cap Head Screw
-
M8x12 Low Profile Cap Head Screw
-
Insert the screws through each hole in the spindle mount and secure it into the spindle mount body
-
-
-
Assembly from the previous step
-
M6x70 Cap Head Screws
-
Square nut M6
-
Do not fully fasten the M6x70 screws at this point. They will be used to hold the spindle in place later in the assembly
-
-
-
Spindle mount assembly
-
M8x22 Cap Head Screws
-
4040 Drop-in T-nut M8
-
Loosely thread a 4040 T-Nut on to each of the M8x22 screws. Do not tighten them at this point.
-
-
-
Spindle Mount Assembly
-
Mount the Spindle mount assembly on to the Z-Axis
-
Push the spindle Mount all the way down on the Z-Axis
-
Check that the spindle mount is flush and square with the Z-axis plate as shown
-
Tighten the M8x22 screws
-
-
-
Spindle Tool
-
Insert the spindle into the mount as shown
-
Tighten the M6x70 screws to secure the spindle in to the mount
-