Changes to Step #3
Edit by Simon Davie —
Edit approved by Simon Davie
- Before
- After
- Unchanged
Step Lines
+ | [title] Assemble the spool holder - Part 2 |
---|---|
+ | [* 2] Assembly from the previous step |
+ | [* 3] 85mm length of PTFE tubing |
+ | [* 10] Using a sharp blade (such as a utility knife), cut two lengths of PTFE tubing measuring 85mm in length |
+ | [* 4] Insert a length of PTFE into each channel of the spool holder as shown |
+ | [* 10] Set the spool holder assembly aside until ***Step 7*** |
Image 1
No previous image
Added
Image 2
No previous image
Added
Image 3
No previous image
Added