Skip to main content

Changes to Step #3

Edit by Simon Davie

Edit approved by Simon Davie

Before
After
Unchanged

Step Lines

[title] Assemble the spool holder - Part 2
[* 2] Assembly from the previous step
[* 3] 85mm length of PTFE tubing
- [* 10] The PTFE tube is provided in one length. Cut two lengths measuring 85mm, using a sharp blade (such as a utility knife).
+ [* 10] Using a sharp blade (such as a utility knife), cut two lengths of PTFE tubing measuring 85mm in length
[* 4] Insert a length of PTFE into each channel of the spool holder as shown
[* 10] Set the spool holder assembly aside until ***Step 7***