Changes to Step #8
Edit by Simon Davie —
Edit approved by Simon Davie
- Before
- After
- Unchanged
Step Lines
+ | [title] Ensure the X-axis gantry is square |
---|---|
+ | [* 10] Before continuing with the assembly, the gantry must be squared and all screws full secured |
+ | [* 2] Begin by fastening the eight M8x16 screws in the extruded brackets. Check that the measurements mentioned in ***Step 3*** are maintained |
+ | [* 3] Using an engineers square, or a flat edge, check that the side plates are flush with the extrusions at the top of the gantry |
+ | [* 4] Fasten all fourteen M12x45 screws on both ends of the gantry to secure everything together |
Image 1
No previous image
Added