Changes to Step #26
Edit by Miguel Cruz —
Edit approved by Miguel Cruz
- Before
- After
- Unchanged
Step Lines
[title] Insert Lead Screw | |
[* 2] Lead Screw | |
[* 3] Insert the Lead Screw from the back of the assembly into the Ball Bearing hole. | |
[* 4] Precision Shim 12x8x1mm | |
[* 10] Slide the Precision Shim into the Lead Screw and push it all the way. | |
- | [* 5] |
- | [* 10] Slide the |
+ | [* 5] Lock Collar |
+ | [* 10] Slide the Lock Colar into the Lead Screw and push it all the way. |