Skip to main content

Changes to Step #26

Edit by Miguel Cruz

Edit approved by Miguel Cruz

Before
After
Unchanged

Step Lines

[title] Insert Lead Screw
[* 2] Lead Screw
[* 3] Insert the Lead Screw from the back of the assembly into the Ball Bearing hole.
[* 4] Precision Shim 12x8x1mm
[* 10] Slide the Precision Shim into the Lead Screw and push it all the way.
-[* 5] 688ZZ Ball Bearing
- [* 10] Slide the Precision Shim into the Lead Screw and push it all the way.
+[* 5] Lock Collar
+ [* 10] Slide the Lock Colar into the Lead Screw and push it all the way.