Reputation over time
It looks like this user hasn't gained any reputation yet.
Once they have, you'll be able to view a graph of their reputation gained over time.
Here's a preview of what the graph will look like:
Reputation Breakdown
Event |
Count |
Delta |
Your comment deleted due to flags |
1 |
-100 |
587
The IEC Patch should be referred to somewhere here
Which ones?
I am wondering if I should populate the jumpers for all seven drivers (UART Mode) if I don't have the Hybrid kit. Or in other words: Will it harm?
This is confusing. If it is a dedicated guide for this enclosure. Why would I need to skip.
Also Step 17 mentions to use the board with the jumpers from stage 16
The driver slots have each 4 jumpers. The picture shows one inserted in the unused ones. Am I really supposed to remove them all?
Also: In my case the jumper to alles power from RPi was already inserted.
Where do I find the installation guide for 2.1.0? Or shall I just follow the linked one but download 2.1.0?
Thanks for the hint @sschueller. I can confirm this works really well
@scottp you're basically done at this point with the core-xy belt routing. You can cut them as short "as you'd like". Usually I keep like 2-3 teeth, but you can cut them perfectly flush if you want.
Yep, highly recommend to follow the advice of @jphi35
"The wider the zip tie is, the easier the process will be"
--> That is not true. Actually if the zip tie is wider than the pulley it won't work at all. SCNR ;-)
Again that's the wrong part. Step 16 has the left top, not the right. It should be Step 15.
Page 1 of 3
Next