Skip to main content

Changes to Step #33

Edit by Rat Rig

Edit approved by Rat Rig

Before
After
Unchanged

Step Lines

+[title] Route the top CoreXY belt
+[* 10] Take one end of the top CoreXY belt, and feed it as shown:
+ [* 2] Feed the belt through the left stepper motor bearing stacks.
+ [* 4] Feed the belt behind the left xy_joiner, through the front tensioner and finally the front bearing stack on the xy_joiner.
+[* 10] Take the other end of the top CoreXY belt, and feed it as shown:
+ [* 3] Feed the belt through the right stepper motor bearing stacks.
+ [* 5] Feed the belt around the rear bearing stack on the xy_joiner.

Image 1

No previous image

New image

Added

Image 2

No previous image

New image

Added