Skip to main content

Changes to Step #33

Edit by Rat Rig

Edit approved by Rat Rig

Before
After
Unchanged

Step Lines

[title] Route the top CoreXY belt
+[* 10] ***Ensure the belt teeth are facing the stepper motor pulleys.***
[* 10] Take one end of the top CoreXY belt, and feed it as shown:
[* 2] Feed the belt through the left stepper motor bearing stacks.
[* 4] Feed the belt behind the left xy_joiner, through the front tensioner and finally the front bearing stack on the xy_joiner.
[* 10] Take the other end of the top CoreXY belt, and feed it as shown:
[* 3] Feed the belt through the right stepper motor bearing stacks.
[* 5] Feed the belt around the rear bearing stack on the xy_joiner.