Skip to main content

Changes to Step #21

Edit by Rat Rig

Edit approved by Rat Rig

Before
After
Unchanged

Step Lines

[title] Remove the second carriage
-[* 11] ONLY remove the second carriage if you are not assembling the IDEX variant.
+[* 11] ***ONLY remove the second carriage if you are not assembling the IDEX variant.***
[* 9] Keeping the second carriage in the X rail will result in poor belt tunning and input shaper results.
[* 2] Align the mgn12c carriage mount with the linear rail
[* 3] Slowly slide one carriage to the mount
[* 4] Carefully store the carriage, this will be essential for the IDEX upgrade.
[* 9] Ensure the carriage never leaves the mount, to avoid loosing any of the ball bearings inside.