Changes to Step #17
Step Lines
[title] Install the lead screw - Part 4 | |
- | [* 2] Insert wisdom here |
+ | [* 2] Lock Collar |
+ | [* 10] The Precision Shim 12x8x1mm should be in between the 688ZZ Ball bearing and the Lock Collar |
+ | [* 3] Insert the lead screw in the following order: lock collar, precision shim, and ball bearing. |
+ | [* 5] Thrust Bearing F8-16M |
+ | [* 10] Install the Thrust Bearing on to the exposed end of the Lead Screw as shown |
+ | [* 6] Jog wheel |
+ | [* 10] Install the Jog wheel on to the exposed end of the Lead Screw as shown |