Skip to main content

Changes to Step #21

Edit by Rat Rig

Edit approved by Rat Rig

Before
After
Unchanged

Step Lines

-[* 1] Insert wisdom here
+[title] Install the lead screw - Part 5
+[* 2] Ensure the lead screw surface is rougtly 1-2mm inside the jog whell
+[* 3] After positioning the jog wheel, tighten the two set screws to secure it in place.
+[* 10] Pull the X joiner plate away from the jog wheel, as to ensure the jog wheel and thrust bearing sit tight against the front Y plate.
+ [* 9] Excessive force is unnecessary, as it may cause the lead screw to bind.
+[* 4] Push the lock collar against the Y front plate.
+[* 5] Tighten the set screw on the lock collar to secure it in place.
+[* 6] Install the Thrust Bearing on to the exposed end of the Lead Screw as shown
+[* 7] Install the Coupler - Disk Type on to the exposed end of the Lead Screw as shown