Skip to main content

Changes to Step #21

Edit by Rat Rig

Edit approved by Rat Rig

Before
After
Unchanged

Step Lines

+[title] Assemble the Z-Axis
+[* 2] Place the Z-axis assembly on the Z tower, ensuring the M8 Low Head
+[* 9] The Z-axis is heavy and difficult to manage alone. Please request assistance from another person to hold the Z-axis while you tighten the screws.
+[* 10] Assemble the M8x25 cap head screws by inserting them through the M8 washers and the Z plates. Then, place an M8 washer on the rear and secure everything with an M8 nylon locking nut.
+[* 3] 4x M8x25 Cap Head Screw
+[* 4] 8x M8 Washer
+[* 5] 4x M8 Nylon Locking Hex Nut

Image 1

No previous image

New image

Added

Image 2

No previous image

New image

Added

Image 3

No previous image

New image

Added