Changes to Step #5
Step Lines
[title] Route the Z axis Stepper wires | |
[* 6] Route the Z-stepper wires as shown in the picture. | |
[* 6] Use a zip tie to constrain it to the mill_stepper_cable_managment printed part, then through the mill_z_tower_top printed part and inside the Z tower. Finally exit at the rear, above the Y stepper and into the electronics enclosure or your desired location. Leave an extra 300mm (at least) to route it to the controller and crimp the connector. | |
- | [* 4] Cut the |
+ | [* 4] Cut the cables to the final length, double check if the cable has the appropriate length to reach the final position of your electronics enclosure before cutting. |
[* 5] Label the cable at the end, with a piece of duct tape for example. |