Changes to Step #9
Step Lines
+ | [title] Route the Y axis cables |
---|---|
+ | [* 6] Route the Y-steppers cables as shown in the picture. |
+ | [* 6] Use a zip tie to constrain it to the mill_stepper_cable_managment printed part, and into the electronics enclosure or your desired location. Leave an extra 300mm (at least) to route it to the controller and crimp the connector. |
+ | [* 4] Cut the cables to the final length, double check if the cable has the appropriate length before cutting. |
+ | [* 5] Label the cable at the end, with a piece of duct tape for example. |