+ | [title] Wire the VFD PWM control |
---|---|
+ | [* 2] 900mm - Multicore 2 Conductor - 24AWG (A-2xFork, B-2xFerrule) (11) |
+ | [* 3] Connect the Red wire to the VI input on the VFD. |
+ | [* 4] Connect the Black wire to the ACM input on the VFD |
+ | [* 5] Ensure the VI jumper is set as shown. |
+ | [* 6] Connect the Red and Black ferrules as to the Rodent output as shown. |
+ | [* 7] Ensure the VFD Jumper wire is set between the ACM and FOR terminals. |