Skip to main content

Changes to Step #4

Edit by Rat Rig

Edit approved by Rat Rig

Before
After
Unchanged

Step Lines

[title] Attach the Z rails
-[* 10] Do not bolt down all of the screws yet, just secure the rail by the two screws on the ends - later adjustment maybe required
+[* 10] Fit the T-Nuts on the linear rails inside the profile slots and use the MGN Alignment tool to align the rail. On each rail, start by tightening the top screw then move down to the bottom screw. Do not bolt down all of the screws in between for now, later adjustment may be required
[* 1] Attach the 3x 400mm Z rails into the frame
-[* 2] Measure the space between the side of the rail and the side of the extrusion - for 3030 it should be 9.00mm on each side - measure each rail in 4 points
+[* 2] If you don't have a MGN Alignment tool, measure the space between the side of the rail and the side of the extrusion - for 3030 it should be 9.00mm on each side - measure each rail in 4 points
[* 1] The rails should not rest on the motor mounts but instead be fastened approx. 1mm above