Skip to main content

Step Type:

Drag to rearrange

Loosen all of the M3 screws securing the linear rail to the V-Core 3.0 frame

Remove the linear rail, taking care not to let the carriage leave either end of the rail

Repeat the above two steps for the linear rail on the front right

Set the linear rail assemblies aside, they will be re-installed during the V-Core 3.1 assembly guide

Your contributions are licensed under the open source Creative Commons license.