03. Addons and Upgrades V-Core 3
View
Options
Preview new Authoring Experience
History
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
Introduction
Details
Guide Steps
Review
Quiz
Loosen all of the M3 screws securing the linear rail to the V-Core 3.0 frame
Remove the linear rail, taking care not to let the carriage leave either end of the rail
Repeat the above two steps for the linear rail on the front right
Set the linear rail assemblies aside, they will be re-installed during the V-Core 3.1 assembly guide
« Previous
Next »
Your contributions are licensed under the open source Creative Commons license.
Next line
Previous line
Insert a new line below
Insert a new line above
Indent current line
Unindent current line
Delete current line
Navigate to next step.
Navigate to previous step.