03. Rat Rig Mill
View
Options
Preview new Authoring Experience
History
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
Introduction
Details
Guide Steps
Review
Quiz
It is strongly recommended to have a second person assist with installing the upper frame, and also to manipulate the frame in the remaining steps. The enclosure weighs roughly 22KG without the panels installed
The enclosure is large and heavy and can cause injury if it were to fall
1x Enclosure top assembly from the previous step
1x Enclosure assembly
Align the inside hidden three way corner assemblies with the upright 3030 extrusions
Once fully aligned and situated, tighten all M6x8 set screws to secure the enclosure frame together
Be careful while tightening the set screws, extreme force may break the three way hidden corner
« Previous
Next »
Your contributions are licensed under the open source Creative Commons license.
Next line
Previous line
Insert a new line below
Insert a new line above
Indent current line
Unindent current line
Delete current line
Navigate to next step.
Navigate to previous step.