Reputation over time
It looks like this user hasn't gained any reputation yet.
Once they have, you'll be able to view a graph of their reputation gained over time.
Here's a preview of what the graph will look like:
Reputation Breakdown
No reputation gained yet.
233
Careful when mounting the screws as you could bend the endstop pin
Easier to just slide the T-nuts in the gantry then slide them into position
Would suggest to run the bottom belt first around the screws so you won’t struggle putting it in within the next step
If you don’t want to flip the frame use tape instead to hold the screws
Use tape to hold the screw in place
Use tape to hold the screw in so you won’t lose your mind holding the screw as you put in the components
Hold off putting on the coupler as you would need to then take it off again to install the linear rail
Note: Test and the adjust the struts now (as in add all the panels to it) especially if you if you don’t have enough space prior to putting it on top as you may find out that the 100nm struts MAY NOT be enough. It may seem to be enough when you adjust it now, but the weight of the panels you will need to re-adjust the struts. With 100nm gas struts RR sent over for the 400 it will not stay up and if it does it would be impossible to have open due to the very small opening. Test the struts now.
Suggestion: the two nuts for me nearly fell out when trying to put it together. I would recommend to just put your probe mount here now if you have one.
Suggestion: add the m5 nut here before putting the belt into the tension block. It’ll be way easier for the next step
Page 1 of 2
Next