03. Rat Rig Mill
View
Options
Preview new Authoring Experience
History
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Introduction
Details
Guide Steps
Review
Quiz
Place the second Z linear rail assembly on the T-slot but DO NOT tighten the screws.
Install the Z Joiner assembly on the linear rails.
Ensure the M5 screw slots are facing the Rat Rig StrongHold ONE CNC - Z-Axis Bottom 10mm side as shown.
Using the 16x M3x6 Cap Head screws, fasten the XY joiner plate assembly to the mgn15 carriages.
MGN15 Rails should be tightened to 98 N-cm of torque, overtightening the screws will result in rail binding.
Tip: Blue thread lock can be added to the thread of the M3x6 Cap Head screws.
« Previous
Next »
Your contributions are licensed under the open source Creative Commons license.
Next line
Previous line
Insert a new line below
Insert a new line above
Indent current line
Unindent current line
Delete current line
Navigate to next step.
Navigate to previous step.