Printed Copies Are Uncontrolled
Wiki ID: 78
Author: Rat Rig
Revision ID: 444
Revision Date: 09-09-24
A step-by-step assembly guide for building a new enclosed Rat Rig V-Core 3.1 from the ground up
00. Preparations
01. Enclosure 2.0 Frame Assembly
02. Z-Axis Assemblies
03. Linear Rails
04. CoreXY Idler Assemblies
05. CoreXY Motor Assemblies
06. X-Axis Assembly
07. Bed Arm Assemblies
08. Bed & Y-Axis Endstop Assemblies
09. EVA 3.0 Heat Insert Assembly
10. EVA 3.0 Hex Nut Assembly
11. X-Axis Gantry Alignment
12. Enclosure Panels
13. Accessories
14. Wiring, Firmware & RatOS
Past 24 Hours: 4
Past 7 Days: 34
Past 30 Days: 163
All Time: 43,502