03. Rat Rig Mill
View
Options
Preview new Authoring Experience
History
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Introduction
Details
Guide Steps
Review
Quiz
While threading the lead screw, ensure that it moves smoothly. It should thread effortlessly while the second POM block remains loose.
Gently tighten the screws on the second POM block while rotating the lead screw by hand. Monitor the resistance carefully—as soon as you feel any increase in resistance, stop tightening. Avoid over-tightening, as this could introduce unnecessary drag to the system.
Gently pull and push the lead screw along its axis to check for backlash. There should be no play when performing this movement. If you detect any play, tighten the screws slightly and test again. Repeat this process until the play is fully eliminated, ensuring a secure fit without introducing excessive resistance.
688ZZ Ball bearing - Push the ball bearing against the inner side of the plate, ensuring it stays inside the designated groove.
Precision Shim 12x8x1mm - Prepare the Shim to be inserted in the lead screw.
« Previous
Next »
Your contributions are licensed under the open source Creative Commons license.
Next line
Previous line
Insert a new line below
Insert a new line above
Indent current line
Unindent current line
Delete current line
Navigate to next step.
Navigate to previous step.