Skip to main content

Step Type:

Drag to rearrange

The Precision Shim 12x8x1mm should be in between the 688ZZ Ball bearing and the Lock Collar

Insert the lead screw in the following order: lock collar, precision shim, and ball bearing.

Thrust Bearing F8-16M

Install the Thrust Bearing on to the exposed end of the Lead Screw as shown

Install the Jog wheel on to the exposed end of the Lead Screw as shown

Your contributions are licensed under the open source Creative Commons license.