Skip to main content

Notice: You are editing a prerequisite guide. Any changes you make will affect the guide that includes this step.

Step Type:

Drag to rearrange

In the following steps, the bed assembly is hidden to better illustrate the VAOC installation. Rat Rig advises removing the bed assembly to provide better access to all fasteners.

Align the two screws with the heat inserts on the rear Z arm.

2x M3x45 Countersink screw

Insert the screws into the VAOC duct side holes and tighten them into the heat inserts located on the rear Z arm.

Take care not to over-tighten the screws as you can damage the printed parts

Your contributions are licensed under the open source Creative Commons license.